Now onboarding businesses across Leeds & Yorkshire — book a free IT & security review
← All resources

Moving Office IT Checklist: A Practical Guide to a Smooth Relocation

In short

An office move can knock out your phones, internet and systems for days if the IT isn't planned early. This guide gives you a clear, non-technical checklist: order broadband and phone lines well ahead, plan cabling and Wi-Fi, protect your data, move equipment carefully and test everything before staff arrive. Start early and downtime becomes a non-event.

Some links on this page are affiliate links: if you sign up or buy through them, Dacros may earn a commission, at no extra cost to you. We only recommend tools we use and rate. Full disclosure.

Why office-move IT needs planning, not luck

Moving premises is stressful enough without arriving on day one to find there’s no internet, the phones are dead and nobody can reach your files. Yet that’s exactly what happens when the IT is left as an afterthought — because the parts that take longest to sort, like broadband and phone lines, are the ones people think about last.

The reassuring news is that a smooth move is almost entirely down to planning. Get the sequence right and start early, and your team can walk into the new office, sit down and carry on working. This guide gives you a practical, non-technical checklist to make that happen with minimal downtime.

Start with a timeline

As a rule of thumb, begin planning the IT eight to twelve weeks before the move, and start the moment your new premises are confirmed. The long pole in the tent is nearly always connectivity, so that’s where the clock is ticking hardest.

A sensible outline looks like this:

  • 8–12 weeks out: confirm the new site, order broadband and phone services, survey the layout.
  • 4–6 weeks out: plan cabling, Wi-Fi and desk positions; confirm installation dates.
  • 1–2 weeks out: take backups, label equipment, brief staff, prepare a moving-day plan.
  • Moving day: move, reconnect, test.
  • First week: iron out snags and confirm everything is working properly.

Step 1: Order connectivity first

Nothing else matters if the internet isn’t ready. Business broadband, and especially dedicated leased lines, can take several weeks to install — sometimes longer if new cabling or engineering work is needed at the new site.

Connectivity is the one thing you cannot rush at the end — order your broadband and phone lines the moment the new premises are confirmed, not the week before you move.

When ordering, consider:

  • Speed and type of connection suited to how your business works — heavy cloud users need more headroom.
  • A backup connection if going offline would seriously hurt you, so a single fault doesn’t stop everything.
  • Installation dates confirmed in writing, ideally a few days before staff arrive so there’s time to test.

Because phones and broadband are so tightly linked in a move, it’s often simplest to arrange them together. A provider that handles business broadband and phone lines as one package can line the installation dates up for you and reduce the number of moving parts.

Step 2: Sort the phones — and consider VoIP

How you handle phones can make or break a move. Traditional phone lines are tied to a physical location, which makes moving them slow and sometimes means changing your number.

Modern internet-based phone systems — VoIP — remove that headache. Because the phone system runs over your internet connection rather than a fixed line, you can usually:

  • Keep your existing business number, wherever you move to.
  • Take your phones with you and simply plug them in at the new site.
  • Divert calls to mobiles during the move so you never miss a customer.

If you’re still on traditional lines, an office move is a natural moment to switch. Our guide to business VoIP phone systems explains how they work in plain English. Whatever you use, confirm well in advance whether your number can move with you.

Step 3: Plan cabling and Wi-Fi for the new layout

A new office rarely has network points exactly where you need them. Walk the space early and think about:

  • Where desks, printers and any servers will sit, and whether there’s a network socket nearby.
  • Whether extra data cabling is needed — running new cables is far easier before furniture arrives and staff move in.
  • Where the broadband comes into the building and where your main network equipment will live (ideally a ventilated, lockable spot, not a hot cupboard).
  • Wi-Fi coverage across the whole space, including meeting rooms and awkward corners. Thick walls and larger floorplans often need more than one access point.

While you’re planning the network, it’s the perfect time to build in secure, well-segmented Wi-Fi with separate staff and guest networks from day one, rather than retrofitting it later.

Step 4: Protect your data before anything is unplugged

A physical move is exactly when equipment gets dropped, lost or occasionally stolen. Before a single cable comes out:

  • Take a full backup of your important systems and files, and check it actually works.
  • Keep a copy off-site or in the cloud, following the 3-2-1 backup approach.
  • Note down key details — logins, licences, supplier contacts — so you’re not hunting for them mid-move.

Done properly, this means a damaged server on moving day is an inconvenience, not a catastrophe.

Step 5: Label, move and reconnect carefully

On the practical side of the move itself:

  • Label everything — cables, ports, devices — with matching tags or photos so it goes back together the same way.
  • Photograph the current setup before dismantling, especially the back of servers and network gear.
  • Move sensitive equipment with care, ideally kept with someone responsible rather than loose in a van.
  • Reconnect in a sensible order: connectivity and core network first, then servers, then computers and phones.

If you have on-premise servers, network switches or anything specialist, this is the stage where professional help pays for itself. Mistakes reconnecting core equipment cause the longest and most stressful outages. Our managed IT support can handle the disconnection, transport and reconnection so your team simply arrives to a working office.

Step 6: Test before staff arrive

Build in time — ideally a day or two — to test everything before the whole team turns up:

  • Internet working at a sensible speed across the office.
  • Phones ringing, dialling out and diverting correctly.
  • Email and files accessible from several devices.
  • Printers and shared equipment connected and working.
  • Wi-Fi reaching every part of the building, on both staff and guest networks.

A short checklist walked through in advance saves a chaotic first morning of “my email won’t work”.

Step 7: Review security once you’re settled

An office move is a rare chance to tidy up your IT and security while everything’s already in flux. Once you’re in, it’s worth:

The short version

An office move goes wrong when the IT is rushed and goes smoothly when it’s planned. Order connectivity and phones first, plan cabling and Wi-Fi around the new layout, back up your data before anything moves, reconnect carefully and test before staff arrive. Do that, and downtime becomes a non-event.

If you’d rather not manage all of this alongside everything else a move involves, we’re happy to take the IT off your plate entirely. Get in touch and we’ll help you relocate without the drama.

Frequently asked questions

How far in advance should we plan the IT for an office move?

Start at least eight to twelve weeks before the move, and ideally as soon as the new premises are confirmed. Business broadband and phone lines can take weeks to install, and if you leave them until the last minute you risk moving into an office with no internet. Everything else is easier once connectivity is booked in.

What's the biggest cause of downtime during an office move?

Connectivity. New broadband or leased lines often have long lead times, and if the order isn't placed early enough your team can be left without internet or phones for days. Ordering connectivity first, and confirming installation dates, prevents the most common and most painful delay.

Can we keep our existing phone number when we move?

Usually yes. Modern internet-based phone systems (VoIP) let you keep your business number wherever you move, because the number isn't tied to a physical line. This is one of the biggest advantages of VoIP over traditional phone lines when relocating — but confirm the details with your provider before the move.

Should we move our own servers and computers or get help?

Simple setups — a few laptops and a cloud-based system — are straightforward to move yourself with care. If you have on-premise servers, network equipment or specialist kit, it's worth having IT support handle the disconnection, transport and reconnection, as mistakes here cause the longest outages.

How do we protect our data during a move?

Take a full, verified backup before anything is unplugged, and keep a copy off-site or in the cloud following the 3-2-1 approach. Physical moving is exactly when equipment gets dropped, lost or stolen, so a good backup means a damaged server is an inconvenience rather than a disaster.

Who writes this

Dacros — led by Jordan Gilbert

Our guides are written and checked by the Dacros team, led by founder Jordan Gilbert. We run the IT and cyber security for UK small businesses — and hold our own systems to the same standard. About Jordan · About Dacros.

Want this handled for you?

Dacros runs the IT and security for UK small businesses. Book a free review and we'll tell you what's worth doing — no jargon, no pressure.